The coal RFP released in December 2014 by the Department of Energy provides for the same methods of connecting to the grid as the Renewable Energy RFP.
There are three methods of connecting to the grid, each with slightly different bid submission requirements. Bidders must elect their preferred grid connection method prior to bid submission.